Our example process, for
the Norsk Hydro Njord
floater is shown on the
next page. This is a
medium size platform
with one production train
and a production of 40-45.000 barrels per day
(bpd). This is actual
production, after
separation of water and
gas. The associated gas
and is used for on board
power generation and gas
reinjection