This MODULE includes the following lessons:
1. HSE Induction Course and chart presentation;
2. Plant General Description;
3. Plant Overview & Layout;
4. Project Philosophy.A-1. Scope and Objectives of the Project
This section of the Training Course is dedicated:
1. To provide the general information necessary for the field operators and the
technicians to exploit Abu Qir gas field;
2. How to manage the NA/Q PIII platform, during :
- start-up operations;
- normal operating conditions;
- maintenance operations;
- emergency production shut-doA-1. Scope and Objectives of the Project
The Platform NA/Q PIII was constructed with the aim to increase exploitation capacity of Abu
Qir field. The platform has been designed to accommodate 6 (six) wells (12 strings) and
receive the well heads production of NA/Q PII. The platform has been designed in order to
accommodate 12 (twelve) strings as follows:
- well “NA/Q PIII-1,3,4,5,6”: double completion (pre-drilled), both strings dedicated to
gas production;
- well “NA/Q PIII-2”: double completion (pre-drilled), one string dedicated to gas and
one to oil production.
• They are unmanned type.
• The platform is designed to operate a maximum of 12 stings at time.
NA/Q PIII PLATFORM BACKGROUND