Arena has 200m running track with super elevations at bends, 60m running track, shot put area, long jump and triple-jump area and high jump area. All line marking and levels shop drawings prepared by MONDO and approved by Saud Consult. 3rd Party surveyor to prepare method statement of setting-out in consultation with SBG surveyor and verify the work of SBG while progressing the work of different surveyors as and when requested. Finally after completion of all flooring works certificate shall be issued by 3rd part surveyor confirming that the work executed in Arena area as per the line and levels shown in the approved shop drawings.