النتائج (
العربية) 1:
[نسخ]نسخ!
Pre concept phase: assessing that critical items are within performance is the main action. In this phase, engineering studies and analyses on the effectiveness of various candidate systems are performed. The engineering team and program management will identify critical item product and process technologies. A review of the initial technology strategy is performed to establish the potential performance variations for each technology. Risk Management Literature Survey Delft University of Technology - 16 - Concept phase: actions: develop requirements; identify and assess risks; define demonstration/validation risk reduction. The most promising concepts are developed in more detail in this phase. Program management and engineers are now able to be more specific in describing significant risk areas of the program, including critical items, new processes, and new technologies. Demonstration/validation phase: actions: test of critical risk areas; requirements/ risk trades. During this phase component, subsystem, and system risk are assessed through breadboard or brassboard testing, prototype testing, and for those items that can not be individually tested, analysis and simulation. The engineering data becomes the risk data, since the purpose of the activity is to select the design approach most likely to satisfy the objectives of the program. Engineering/manufacturing phase:actions: identify and assess risks; risk mitigation planning; Risk tracking and reporting. In this phase, program management must work with the information which defines the state of development of the system and potential and real problems. Risk tracking is very important in this phase since the earlier a risk is resolved, the lower the cost. Production / Deployment: risk planning; risk monitoring and reporting The emphasis in this phase is to monitor production process progress to determine both product and production deficiencies. Risk management can add consideration of possible variations around the nominal performance numbers. Operations and support: risk monitoring and reporting. In this phase the environment in which the system operates is leading. In unmanned space projects only risk or system monitoring and reporting can be done. The only possibility here to mitigate risks is risks concerning collisions and software risks.
يجري ترجمتها، يرجى الانتظار ..
