النتائج (
العربية) 1:
[نسخ]نسخ!
• BoilersThe pressure test has to be made by adding an inhibitor to the water during pressure test. Afterpressure test of the boiler, the water is drained and a powdered inhibitor is added. E.g. CortecVCI-609, or other corresponding product. The dosing of the inhibitor has to be checkedfrom the manufacturer’s manual. After adding the inhibitor, all open joints and holes have to beclosed.
يجري ترجمتها، يرجى الانتظار ..
