and based on your request for multiple shafts to be dewatered simultaneously, our experts calculated the potential flow of water that would be between 9,000 and 12,000 M3/hour. This clearly exceeds the permitted lirnit and, as such, Al Jabor Dewatering works have been, and are still, within the applicable law/s limit. Any deviation by way of increased discharge wili be in breach of the local laws and regulations.