• 1 AUTOMATED / MANUAL STARTUP SEQUENCE
The operation of a platform processing system can be viewed as an automated/manual sequence of f goal states,1 such as plant pre-startup, startup, normal running, hot shutdown, and cold shutdown. The synthesis of operating procedures can then be viewed as finding a set of actions which would bring the system from some initial state to a goal state, subject to constraints dictated by consideration of process, process equipment, safety, and environmental consequences.

1.1 Initial Startup Procedures
At this point all systems and equipment shall be at a stage where hydrocarbons/ injection water can be safely introduced and all equipment can be safely operated with all controls and safety devices in service.

1.-Prestart-Up Check List

2.-Make Area Safe (i.e: Packing and Seals, Removal of Temporary Supports, Alignment of Rotating Equipment, System Check / Inspection, etc). Provide continuous cleanup of the construction and operational area. Remove excess materials, temporary facilities and scaffolding and pick up trash. Perform washing for further cleanup as required

3.-Utilities Commissioning: Prepare all systems for safe tie-ins with bridge connected platform or with existing operating systems. Inspect vessel interior along with Company / certifying authority before filling with chemicals for proper cleanliness.

4.- Leak Test: After completion of all pre-commissioning activities, safety checks and hydro test, leak test of complete process facilities including piping, equipment, instrument connections etc

5.-Flushing, Air Purging and Gas Blanketing: Perform flushing and blowing of all piping to remove dirt, welding slag, etc. Arrange for cleaning media for carrying out flushing/blowing and disposal of the cleaning media in accordance with minimum procedures. Install necessary purge connections and carry out system purging including that of flare and vent with Nitrogen in accordance with Company approved procedure. The final Oxygen content in purged systems shall be reduced to an approved safe limit. Contractor shall arrange & supply the Nitrogen required for purging.

6.-Establish Flow in the Unit (see Startup Sequence)

7.-Inhibitor/Chemical Injections startup (see Startup Sequence)

8.-Adjust Operation to Obtain Quality: Once the units or equipment are operating, verify that all the stream properties are according with the quality parameters requirements. Adjust the process variables necessary to get final quality parameters.


0/5000
من: -
إلى: -
النتائج (العربية) 1: [نسخ]
نسخ!
:• 1 AUTOMATED / MANUAL STARTUP SEQUENCE The operation of a platform processing system can be viewed as an automated/manual sequence of f goal states,1 such as plant pre-startup, startup, normal running, hot shutdown, and cold shutdown. The synthesis of operating procedures can then be viewed as finding a set of actions which would bring the system from some initial state to a goal state, subject to constraints dictated by consideration of process, process equipment, safety, and environmental consequences.1.1 Initial Startup Procedures At this point all systems and equipment shall be at a stage where hydrocarbons/ injection water can be safely introduced and all equipment can be safely operated with all controls and safety devices in service.1.-Prestart-Up Check List2.-Make Area Safe (i.e: Packing and Seals, Removal of Temporary Supports, Alignment of Rotating Equipment, System Check / Inspection, etc). Provide continuous cleanup of the construction and operational area. Remove excess materials, temporary facilities and scaffolding and pick up trash. Perform washing for further cleanup as required3.-Utilities Commissioning: Prepare all systems for safe tie-ins with bridge connected platform or with existing operating systems. Inspect vessel interior along with Company / certifying authority before filling with chemicals for proper cleanliness.4.- Leak Test: After completion of all pre-commissioning activities, safety checks and hydro test, leak test of complete process facilities including piping, equipment, instrument connections etc5.-Flushing, Air Purging and Gas Blanketing: Perform flushing and blowing of all piping to remove dirt, welding slag, etc. Arrange for cleaning media for carrying out flushing/blowing and disposal of the cleaning media in accordance with minimum procedures. Install necessary purge connections and carry out system purging including that of flare and vent with Nitrogen in accordance with Company approved procedure. The final Oxygen content in purged systems shall be reduced to an approved safe limit. Contractor shall arrange & supply the Nitrogen required for purging.6.-Establish Flow in the Unit (see Startup Sequence)7.-Inhibitor/Chemical Injections startup (see Startup Sequence)8.-Adjust Operation to Obtain Quality: Once the units or equipment are operating, verify that all the stream properties are according with the quality parameters requirements. Adjust the process variables necessary to get final quality parameters.
يجري ترجمتها، يرجى الانتظار ..
النتائج (العربية) 2:[نسخ]
نسخ!
: • 1 AUTOMATED / MANUAL تسلسل بدء التشغيل وتشغيل نظام المعالجة منصة يمكن اعتبار تسلسل الآلي / دليل الدول هدف و (1)، مثل مصنع ما قبل بدء التشغيل، بدء التشغيل، التشغيل العادي، واغلاق الساخن، وإيقاف الباردة. تركيب إجراءات التشغيل ويمكن بعد ذلك أن ينظر إليه باعتباره العثور على مجموعة من الإجراءات التي من شأنها أن تجعل هذا النظام من بعض الحالة الأولية إلى حالة الهدف، تخضع لقيود تفرضها النظر في العملية، معدات العمليات، والسلامة، والآثار البيئية. 1.1 بدء التشغيل الأولي إجراءات في هذه المرحلة جميع النظم والمعدات يجب أن تكون في مرحلة تكون فيها المياه الهيدروكربونات / حقن يمكن إدخال بسلام وجميع المعدات يمكن أن تعمل بأمان مع جميع الضوابط وأجهزة السلامة في الخدمة. 1. Prestart الهاتفي تحقق قائمة 2. مستحضرات منطقة آمنة (أي: التعبئة والأختام، وإزالة دعامات مؤقتة، محاذاة المعدات الدوارة، نظام تدقيق / التفتيش، وما إلى ذلك). توفير تنظيف المستمر للبناء ومنطقة العمليات. إزالة المواد الزائدة، والمرافق المؤقتة والسقالات والتقاط القمامة. أداء الغسيل لمزيد من تنظيف كما هو مطلوب 3. المرافق التكليف: إعداد جميع أنظمة آمنة التعادل الإضافية مع منصة جسر اتصال أو مع أنظمة التشغيل الحالية. تفقد الداخلية السفينة مع شركة / سلطة التصديق قبل ملء مع المواد الكيميائية للنظافة المناسبة. 4.- تسرب اختبار: بعد الانتهاء من جميع الأنشطة التكليف قبل والشيكات السلامة واختبار المائية، اختبار تسرب من مرافق عملية كاملة بما في ذلك الأنابيب والمعدات وأداة اتصالات الخ 5. فلاشينغ، التطهير الهواء والغاز وتغطية: إجراء التنظيف وتهب من جميع الأنابيب لإزالة الأوساخ والخبث لحام، الخ ترتيب لتنظيف وسائل الإعلام لتنفيذ التنظيف / تهب والتخلص من وسائل الإعلام التنظيف وفقا للإجراءات الحد الأدنى . تثبيت اتصالات تطهير اللازمة وتنفيذ تطهير النظام بما في ذلك مضيئة وتنفيس مع النيتروجين وفقا للإجراءات الشركة المعتمدة. يتم تخفيض محتوى الأوكسجين النهائي في أنظمة تطهير إلى الحد الآمن المعتمدة. يجب على المقاول ترتيب وتوريد النيتروجين اللازم لتطهير. 6. إنشاء تدفق في وحدة (انظر بدء تسلسل) 7. المانع / الحقن الكيميائية بدء التشغيل (انظر بدء تسلسل) 8. في ضبط عملية الحصول على الجودة: مرة واحدة في وحدات أو معدات تعمل، تحقق من أن كافة خصائص الدفق يتم وفقا لمتطلبات معايير الجودة. ضبط المتغيرات العملية اللازمة للحصول على معايير الجودة النهائية.
























يجري ترجمتها، يرجى الانتظار ..
 
لغات أخرى
دعم الترجمة أداة: الآيسلندية, الأذرية, الأردية, الأفريقانية, الألبانية, الألمانية, الأمهرية, الأوديا (الأوريا), الأوزبكية, الأوكرانية, الأويغورية, الأيرلندية, الإسبانية, الإستونية, الإنجليزية, الإندونيسية, الإيطالية, الإيغبو, الارمنية, الاسبرانتو, الاسكتلندية الغالية, الباسكية, الباشتوية, البرتغالية, البلغارية, البنجابية, البنغالية, البورمية, البوسنية, البولندية, البيلاروسية, التاميلية, التايلاندية, التتارية, التركمانية, التركية, التشيكية, التعرّف التلقائي على اللغة, التيلوجو, الجاليكية, الجاوية, الجورجية, الخؤوصا, الخميرية, الدانماركية, الروسية, الرومانية, الزولوية, الساموانية, الساندينيزية, السلوفاكية, السلوفينية, السندية, السنهالية, السواحيلية, السويدية, السيبيوانية, السيسوتو, الشونا, الصربية, الصومالية, الصينية, الطاجيكي, العبرية, العربية, الغوجراتية, الفارسية, الفرنسية, الفريزية, الفلبينية, الفنلندية, الفيتنامية, القطلونية, القيرغيزية, الكازاكي, الكانادا, الكردية, الكرواتية, الكشف التلقائي, الكورسيكي, الكورية, الكينيارواندية, اللاتفية, اللاتينية, اللاوو, اللغة الكريولية الهايتية, اللوكسمبورغية, الليتوانية, المالايالامية, المالطيّة, الماورية, المدغشقرية, المقدونية, الملايو, المنغولية, المهراتية, النرويجية, النيبالية, الهمونجية, الهندية, الهنغارية, الهوسا, الهولندية, الويلزية, اليورباية, اليونانية, الييدية, تشيتشوا, كلينجون, لغة هاواي, ياباني, لغة الترجمة.

Copyright ©2025 I Love Translation. All reserved.

E-mail: