When 3D seismic investigation has been completed, it is time to drill the well. Normally, dedicated drilling rigs either on mobile onshore units or offshore floating rigs are used. Larger production platforms may also have their own production drilling equipment. The main components of the drilling rig are the derrick, floor, draw works, drive and mud handling. Control and power can be hydraulic or electric