project/ fyfa project
subject/ approval for LV cable calculation & control panel & cable routing drawing for the project .
according to the project and the subject above and for your latter number : M010 -130-11-30 on date 25-9-1436 .
we need to let you know that after study the mathematical note that provided from you :
1- you must attached SLD that showing cables that supplies the pumps and the lenght for the cables
2- review and make sure from voltage drop due to how far the provided pumps , not more than 3% , and review the calculation for source cable again .
3- attache the drawing for each pump and the control drawing for each pump .