The study concluded that the Sharq Crossing road infrastructure would likely reach design capacity within two years after opening. In terms of return on investment, on the Consortium’s CDVE cost estimate, an initial road toll of QAR 110 would need to be charged to break even for each single trip on the crossing and the pay pack period would be infinite.