6 Ceiling Finishes
6.1 Supply and installation of multi-level gypsum ceiling as per the design, all with GI structure and frame works, covering 1.0 Hr. (mandatory) fire rated gypsum board, taping the joints and skim coating entire surface, all with primer under coat and applying two coats of silk emulsion paint, including cut outs for the lights, a/c grills and all other services.
6.2 Fixing of existing ceiling tiles, with suspended surface grids fitment, all hanging with GI wire hangers, wall angles and supports
7 Electrical & Data Works
7.1 Removal of existing power points keep aside and re-installation of same. (To use all existing available wires sockets etc.)
7.2 Removal of existing Data & voice points keep aside and re-installation of same. (To use all existing available wires sockets etc.)
7.3 Providing containment for services like security, Q mastic etc.
7.4 Re installation of light fixtures with modification of wiring as required.
7.5 Complete modification works for the cctv and security system for the branch
7.6 Complete modification works for the fire alarm and fire fighting system for the branch
7.7 Complete modification works for the structured cabling, data system, telephone system for the branch.
8 Other Works
8.1 Cleaning of entire bank area after completion of work.