. Employment of project specific metrics is actually what sets them apart from preliminary economic assessments (PEA), or scoping studies, which are generally based on industry standards rather than derived from detailed site-specific data. For instance, in a pre-feasibility study, the intricacies of the processing methods will be based on initial metallurgical studies of the mineralization in the deposit in question, not standard industry methods.