Project Challenges:
1. Site was consists of random pipe lines.
2. The surface layer of soil was sponge layer which did not allow the heavy equipment to move through it.
3. No suitable entrances to enter the site and allow equipment to go inside the site, like (Concrete Pumps – Heavy Equipment).
Execution period: