Installation of disconnect switch including junction boxes,wiring. clamps, screws, hangers and all other necessary accessories to complete the work
16.9.1 DS 30 A
DS 125 A
16.1 POWER TRANSFORMER
Supply, install, test and commision package Transformer (RMU 630A,TRANSFORMER , (L.V SIDE including main breaker, branch circuit breaker ,kwh for branch circuit breaker or kwh separate room)) 13.8kv400v230v 60HZ including, wires, conduit.grounding and other materials and system components required for a complete and functional installation.
16.10.1 package oil transformer 500 KVA DYN 11
16.10.2 package oil transformer 1000 KVA DYN 11
16.10.3 package oil transformer 1500 KVA DYN 11
16.11 LIGHTNING SYSTEM
Supply, Install and test following grounding wires air trminal , down conductors ,bare coppers and all materials needed for a complete installation.
16.11.1 bare tape copper 3*25mm
16.11.2 air teminal rod 60cm hieght
16.11.3 down conductor 70 mm2
16.12.1 supply electrical service from sceco to the project including all financial cost including m.v equipments, kva cost,and all administration proceducer with sceco to complete the work