For 2 nd gas cylinder with M.S. door. (for twin villa).
: Inside the compound wall back filling 15 trips, leveling, Water curing, sand filling, Compacting, New interlock fixing after top sand filling with cleaning Including front out of compound wall . With all materials and Labour charges is R.O. 7.8// per Sq.m.
: As per drawing cost R.O. 10/= per mtr.
: Oman made (Oman Cable).
: Al-Shams
: Al-Hassan 2 Nos.
:Done by 4mm sheet Saudia made with 10 (Ten) years Guarantee.